Description :






The construction method of anti crack stickers is as follows:
(1) Closed traffic
(2) Clean the construction road surface to ensure that there are no weeds, oil stains, gravel, or other debris on the base surface, ensuring that the road surface is clean and dry to avoid affecting the adhesion between the waterproof membrane and the original road surface.
(3) For road sections with defects such as rough surface, severe looseness, cracks, large protrusions or depressions on the surface of the base layer, corresponding treatment must be carried out to ensure sufficient flatness and strength of the base layer.
(4) Construction layout, the working surface is laid out according to the paving width to ensure the width and linearity of the paving layer.
Laying process:
(1) Use a simple unwinding cart for the initial laying of waterproof membrane rolls, with the isolation membrane underneath.
(2) Manually adjust whether the overlap of waterproof membrane laying materials meets the requirements and is straight.
(3) Lift up the starting end of the waterproof membrane about one meter long and lay it flat on the waterproof membrane material in reverse. Carefully remove the isolation membrane completely to one meter away.
(4) Use the isolation film release roller to roll the isolation film to a distance of about 0.9 meters from the isolation film, while lifting the waterproof film material to maintain a distance of about 0.1 meters between the release roller and the waterproof film.
(5) Reset and tighten the flipped waterproof film, then stick it onto the base layer. Push the demolding roller to remove the isolation film.
(6) When constructing multiple working faces, the following sequence should be followed: the working faces should be constructed in the order of front and back, that is, after the waterproof membrane is laid on the previous working face, the next working face can start working and overlap at the end of the previous working face.
AfterSalesService :